Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114
Middle East Team | Global Ops

Our Middle Eastern Experience

Fracture Detection and Modelling – DNF & CFM

Identifying fractures from seismic data, calibrating with well data, surface and regional data, and building a fracture model either as Discrete Fracture Model (DFM) or Continuous Fracture Model (CFM)

EXPLORE

Fractured Carbonates

Representing a fractured, carbonate reservoir with a Discrete Fracture Network (DFN) produces an intuitively understandable model

EXPLORE

Cross Border Fields Development Study

Two giant oil fields that straddle the international border of Iraq and Kuwait and had been developed separately. In 2019, ERCE was appointed to outline the technical and legal mechanisms for the clients to develop and invest in these oilfields.

EXPLORE

About Middle East

Our management team has worked with and operated assets in the Middle East throughout the past 35 years.

Since 2005, we have been at the forefront of providing a technical and commercial evaluation in the Northern Iraqi region of Kurdistan. Our work ranges from basin studies to field development planning and RBL evaluations.

Contact Us

Contact Us

UK Head Office:

ERC Equipoise Limited
6th Floor Stephenson House
2 Cherry Orchard Road
Croydon CR0 6BA
London U.K.

+44 (0) 20 8256 1150
enquiries@erce.energy

ERC Equipoise Pte Ltd
32 Pekin Street
#05 – 01
Singapore
048762

enquiries.asiapacific@erce.energy

ERCE Australia Pty Ltd
2a/83 Havelock Street,
West Perth WA 6005
Australia

+08 9322 2675
enquiries.australia@erce.energy

ERC Evolution (Canada) Ltd.
Suite 500 – 602
12 Ave SW
Calgary,
AB, T2R 1J3

enquiries@ercevolution.energy

ERCE Malaysia Sdn. Bhd.
Level 18, Equatorial Plaza,
Jalan Sultan Ismail,
Kuala Lumpur. 50250
Malaysia

+603 2615 2733
enquiries.asiapacific@erce.energy