Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the all-in-one-wp-security-and-firewall domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the wordpress-seo domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114

Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the breadcrumb-navxt domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /var/www/vhosts/erce.energy/staging.erce.energy/wp-includes/functions.php on line 6114
Longboat Kertang RR Case Study - ERCE
Reserves & Resources

Longboat Kertang RR Case Study

Reserves & Resources

Asia

In anticipation of a farm-out process, Longboat commissioned ERCE to undertake a Competent Person’s Report (CPR) on the Kertang prospect in Block 2A, offshore Sarawak in Eastern Malaysia. Longboat are operator with a 52.5% interest along with Petonas Carigali (40%) and Petros (7.5%)

ERCE estimated PRMS compliant Prospective resources ranges  for the two main reservoir layers as well as two shallower amplitude driven targets located within the overburden. ERCE performed extensive geophysics analysis of the 3D seismic  across the area, as well as drawing on the companies extensive regional experience to parameterise ranges of resources and geological chance of success.

Nick Ingrassia, Longboat CEO commented he was “extremely pleased with the results of the CPR”